Caution

Care should be taken due to the presence of driftwood throughout the river.
Bridge: Wouri Bridge, with a vertical clearance of about 5.0m,0 spans the river between a point N of Douala and Bonaberi close W.
Speed: Maximum speed in Wouri Channel is 14kts. A lesser speed may be necessary to prevent a vessel's wash from causing erosion to the banks.

Includes content supplied by IHS Global Ltd.; Copyright © IHS Global, Ltd., 2019. All rights reserved.

Latest Related News

View All News